The artifacts

Plan, handoff, memory, and the optional QA record — one job each, never duplicated.

Four files, one job each. They never duplicate each other, and the same <slug> ties them together so one search finds all of them.

flowchart LR
    subgraph repo["committed in YOUR repository"]
      direction TB
      PLAN["docs/plans/your-plan.md<br/>THE ROADMAP<br/>every phase, the graph, the budget"]
      HAND["docs/handoffs/your-plan/<br/>THE BATON<br/>phase-NN-*.md + INDEX.md"]
      QA["docs/handoffs/your-plan/test-status.md<br/>QA VERDICTS — optional"]
      GATE["docs/handoffs/your-plan/gate-status.md<br/>GATE CLEARANCES — optional"]
    end
    MEM["memory: project_your-plan<br/>DURABLE FACTS<br/>status, commits, gotchas"]

    PLAN --> S["a fresh session,<br/>zero prior context"]
    HAND --> S
    QA --> S
    GATE --> S
    MEM --> S

    class PLAN plan
    class HAND hand
    class QA qa
    class GATE qa
    class MEM mem
    class S sess

    classDef plan fill:#4FA8FF,stroke:#2B7BC9,color:#04131F
    classDef hand fill:#3FB68B,stroke:#248063,color:#06251A
    classDef qa fill:#C77DFF,stroke:#9147C4,color:#1B0A26
    classDef mem fill:#FFB627,stroke:#B8790C,color:#2A1C00
    classDef sess fill:#152730,stroke:#3A5560,color:#E6EDF0,stroke-width:2px
ArtifactWhereIts one job
Plandocs/plans/<slug>.mdThe durable roadmap: every phase, the dependency graph, per-phase detail, exit criteria. Written once, rarely edited.
Handoffdocs/handoffs/<slug>/phase-NN-*.md + INDEX.mdThe baton for the next cold session: state now, files changed, decisions, exact next commands. Written at the end of every phase.
Memoryproject_<slug> in your memory indexDurable cross-session facts — status as a set, commit shas, gates, gotchas.
QA status (opt-in)docs/handoffs/<slug>/test-status.md + reports/Per-phase verdicts that gate dependents. Does not exist unless you turn QA on.
Gate approvals (only once a gate is cleared)docs/handoffs/<slug>/gate-status.mdPer-phase gate clearances written by gate-approve.sh — the console's Gate card, an AI session that verified an ai gate, or a hand run. --gate-status honours an approved row for every gate kind. A separate file from the QA table on purpose: recording an approval must never flip QA gating on.

Plans and handoffs live in your project repo, committed and pushed — so any machine or account can pull and continue. The skill itself stays separate; work-state never goes in the skill folder.

A plan can be closed

Everything above is computed. "Is every phase done?" is read off the handoffs; nothing about it is stored, so it can never go stale. But there is one question the handoffs cannot answer — does anyone still care? A plan can be perfectly well-formed, half-finished, and dead: the idea was dropped, the approach was replaced, the product moved. No amount of reading the files reveals that. So it is the one piece of plan state that is stored, in the plan's own frontmatter:

status: abandoned            # active | complete | abandoned | superseded
closed: 2026-03-14
closed_reason: replaced by the checkout-rewrite plan

A terminal status — complete, abandoned or superseded — means the plan is closed. Set it with the script rather than by hand, so the date and the reason land in the right shape:

scripts/close-plan.sh checkout-rewrite --reason "superseded by the payments rework"
scripts/close-plan.sh checkout-rewrite --status superseded --reason "…"
scripts/close-plan.sh checkout-rewrite --reopen        # back to active, both fields stripped

Closing is reversible by design--reopen is always available, which is what makes closing a cheap decision rather than a destructive one. From the console it is the same script behind a dialog (Close plan / Reopen on the plan page).

What closing changes: a closed plan stops asking for attention. No ready phases, no boot prompts, no batching suggestions, no stuck-handoff or QA-failure or drift warnings, no notifications about work landing. What it does not do is hide anything:

Closing a plan…
Stopsready phases and boot prompts · session batching · stale-handoff, QA-fail, index-drift and stale-lock reports · progress notifications · every portfolio total, the ready queue and the stalled list
Keepsthe full board, exactly as it was · search results (with a closed badge) · genuine structural damage — a malformed row, a missing dependency, a cycle — reported as a note rather than an error

That split is the whole design. Closing a plan quiets it; it never hides it. "We tried this once and stopped" is precisely the question a closed plan exists to answer, so it stays findable forever — it just stops appearing on the surfaces that mean do something today.

Two ideas that look alike and must not blur: a closed plan can have unfinished phases, and a plan whose every phase is done is still open until somebody says otherwise. Finishing is about the work; closing is about the intent.